Cogeneration power plants, biomass fired, turn key projects
- Strizivojna HRAST, Croatia, 3,3 MW(el) + 6 MW(th), completed 2010.
- BE-TO Glina, Croatia, 1,2 MW(el) + 5 MW(th), completed 2015.
- BE Sava, Croatia, 2 MW(el) + 4 MW(th), completed 2017.
Biomass and waste fired boiler
Year | Plant | Contracted | Fuel | Capacity (t/h) | Design pressure (bar) | Design temp. (°C) |
2017 | Stara Gradiška, Croatia | BCP Turn-key | wood chip, bark, production wood waste | 13 | 40 | 400 |
2015 | Glina, Croatia | BCP Turn-key | wood chip, bark, production wood waste | 10 | 35 | 350 |
2012 | Tanin Sevnica, Slovenia | Burning system and boiler retrofit | wood waste from production | 22,5 | 45 | 450 |
2011 | Tyrone, Northern Ireland | Boiler delivery | waste construction wood | 13,7 | 42 | 420 |
2011 | Strizivojna HRAST, Croatia | BCP Turn-key | wood chip, bark, production wood waste | 20 | 40 | 400 |
2010 | Stramproy, Netherland | Boiler delivery | wood chip i waste wood | 13,5 | 52 | 450 |
2009 | Valorbois, Belgium | Boiler delivery | wood chip | 20 | 55 | 450 |
2008 | Isabella Plants, Philippines Two identical boilers |
Boiler delivery | rice husks | 11,5 | 32 | 425 |
2008 | Tanin Sevnica, Slovenia | Boiler retrofit | wood waste from production | 22,5 | 45 | 450 |
2007 | TO Celje, Slovenia | Boiler delivery | waste (RDF) | 20 | 36 | 360 |
2006 | Sulzbach, Germany | Boiler delivery | forrest biomass | 22 | 55 | 455 |